Single Girder EOT Cranes Manufacturer in Chennai
Macroverse designs and builds single girder EOT cranes, also called single girder bridge cranes, for capacities from 1 Ton to 16 Tons and spans up to 30 metres. Each crane uses a top running single girder bridge with the hoist trolley suspended below it, cutting dead weight and structural loading compared to a double girder crane, and keeping foundation and runway costs lower for light and medium duty applications.
- Capacity: 1 Ton – 16 Tons
- Span: Up to 30 metres
- Standards: IS 3177, IS 807
- Best for: Light to medium duty workshops, warehouses, and assembly lines

Technical Specification of Macroverse Single Girder EOT Cranes
Configuration Options
Crane Arrangement

Top Running
- Rails positioned above the runway beams
- Suitable for new industrial buildings
- Requires adequate structural support
- Suitable for higher-capacity applications

UNDERSLUNG
- Runs beneath the runway beam
- Makes use of existing structural steel
- Useful where headroom is restricted
- Can minimise additional runway structures
Girder Construction

ROLLED SECTION
- Lower material and fabrication requirements
- Suitable for lighter lifting applications
- Well suited to shorter spans
- Cost-efficient construction

BOX GIRDER
- Higher structural stiffness
- Better torsional rigidity
- Suitable for longer spans
- Suitable for higher-capacity applications
Hoisting System

CHAIN HOIST
- Compact design
- Economical solution
- Suitable for lighter capacities
- Suitable for lighter-duty cycles

WIRE ROPE HOIST
- Higher lifting capacity
- Faster lifting speeds
- Suitable for demanding duty cycles
- Suitable for multi-shift operation
How to Size a Single Girder EOT Crane
5 Key Inputs

The heaviest single load to be lifted in tons

The bay width or span you need covered

The heaviest single load to be lifted in tons

How often the crane will lift through a shift

Indoor or outdoor use and any corrosive hot or hazardous conditions
What Affects the Price of a Single Girder EOT Crane
Heavier loads and longer spans require more steel and a stronger girder section


Longer Span
At the same capacity, hoist type affects the equipement cost.
Lower Cost
Higer Cost
Control add cost in a fixed order, with pendant control as the base case and radio remote control as the next level

Cost effective

-> Higher Cost
VFD drives increase the initial cost but reduce load sway and wear, which can lower maintanance cost over the crans life.

Lower Inital Cost

Higher Initial Cost
Whether Macroverse supplies only the crane or the runway beam and gantry structure as well will change the total project cost.


Applications Across Industries
Single girder bridge cranes are the right fit wherever the load stays within their range and the building doesn't demand double girder capacity:





From Design to Long-Term Support


